For all of you who helped me decide on brick...........here it is! Thank you! I love it!!
Corner shelves were added to the 2 secondary bathrooms.
Kitchen backsplash is getting installed!
Lights are ready to be installed!
Master shower floor was installed:
And we sat outside for nearly 20 minutes just watching them put up the brick.
And then today..............................
The kitchen backsplash was completed
Kitchen faucet
Toilets and light fixtures were installed in the bathrooms
The master tub tile was finished (except the front where they are waiting on some more tiles)
Light fixtures were installed!
Master Bathroom lights and faucets
Hall bathroom with new lights, faucets and shower head
Formal Dining Room with new light fixture
Kate's room with new ceiling fan
More brick and stone!!
Living room with new ceiling fan
Another picture of the master tub with tile detail
Brick on the other side of the house
And the light switches and outlet covers were installed!! You know this means you're getting close!
I'm so happy with today's progress!!