Wednesday, July 22, 2015

Brick, Stone, Plumbing and Electrical!

The past two days have been A-MAZING!!! SOOOO much has happened and its all of the pretty, detail stuff. The main one being BRICK AND STONE!! These were from yesterday:
 
 For all of you who helped me decide on brick...........here it is! Thank you! I love it!!
 Corner shelves were added to the 2 secondary bathrooms.
 Kitchen backsplash is getting installed!
 Lights are ready to be installed!
 Master shower floor was installed:
 And we sat outside for nearly 20 minutes just watching them put up the brick.

And then today..............................
 The kitchen backsplash was completed


Kitchen faucet
 Toilets and light fixtures were installed in the bathrooms
 The master tub tile was finished (except the front where they are waiting on some more tiles)
 Light fixtures were installed!
 Master Bathroom lights and faucets
 Ceiling fans were installed
 
Hall bathroom with new lights, faucets and shower head

 Formal Dining Room with new light fixture

Kate's room with new ceiling fan
 
More brick and stone!!
 
Living room with new ceiling fan
 
Another picture of the master tub with tile detail

 Brick on the other side of the house
 
And the light switches and outlet covers were installed!! You know this means you're getting close!
I'm so happy with today's progress!!

No comments:

Post a Comment